Tamilnadu Generation & Distribution Corporation proposes a seawater reverse osmosis-based desalination plant in dist. Thoothukudi, Tamil Nadu.

April 13, 2015

Desalination

Status: Planning Stage

Promoter: Tamilnadu Generation & Distribution Corporation

Project: Proposes a 10 MLD sea water reverse osmosis-based desalination plant

Location: Tuticorin Thermal Power Station, dist. Thoothukudi, Tamil Nadu.

Project Details: According to MoEF sources, the project will be constructed to meet the raw water requirement of its existing 5×210 MW capacity Tuticorin Thermal Power Station. The raw water for the power station is obtained from Thamiraparani river, Coal from Bengal-Bihar coal mines by ship, and the cooling water from the Tuticorin harbour basin. At present the raw water requirement of TTPS is being met out from the water supply by Tamil Nadu Water Supply and Drainage Board (TWAD) through 20 MGD scheme from Tamiraparani river basin. TWAD board has allotted 3.5 MGD i.e., 15.89 MLD of water from their source from Tamirabarani at Manjaneerkayal under 20 MGD scheme to TTPS. Now TTPS utilizes about 1.75 MGD of water for D.M. plant, other service purposes and township usage. An area of 30,400 sq.mtrs. is available in eastern side of cooling water pump house in between cooling water channel for unit 1,2 & 3 and northern compound wall. This area is sufficient for the proposed desalination plant.

It is proposed to draw sea water for this desalination plant from cooling water pump house-I. Water requirement for this desalination plant is about 1,250 cu.mtrs./hr. It is proposed to dispose the brines at outfall arrangements for unit I, II & III. About 90,000 cu.mtrs./hr of sea water is being let-out from unit I, II & III through the outfall structure. The brines disposal from this desalination plant is about 833.33 cu.mtrs./hr. It is proposed to convey the sea water from cooling water pump house-I to this desalination plant by buried pipe line. The brine disposal will also through buried pipe line of size 450mm outer dia HDPE pipe. For conveying raw water produced from this desalination plant to GLRs, it is proposed use 300mm dia MS ERW pipe.


Adani Power Rajasthan is planning an expansion of Kawai Thermal Power Plant in dist. Baran, Rajasthan.

November 13, 2014

Thermal Power

Status: Planning Stage

Promoter: Adani Power Rajasthan

Project: Plans capacity expansion of the Kawai Coal-based Thermal Power Plant

Location: Kawai, dist. Baran, Rajasthan.

Project Detail: The capacity will be augmented from 1,320 MW by addition of 2×800 MW. The project is waiting for environmental clearance.

 

Anantha Power Projects is planning a hydro electric power project in dist. Rajnandgaon, Chhattisgarh.

Anantha Power Projects is planning a 3×2.6 MW hydro electric power project at Village Mohanpur, dist. Rajnandgaon, Chhattisgarh. The company is in final stages of placing orders for machinery. Clearances have been received. Work on the project is expected to commence in September 2014 & is planned for completion in September 2015.


Astrix Laboratories is planning a coal-based CPP in dist. Medak, Telangana.

October 14, 2014

Thermal Power

Status: Planning

Promoter: Astrix Laboratories

Project: Planning Captive power project

Capacity: 5 MW

Fuel: Coal

Location: Village Gaddapotharam, dist. Medak, Telangana

Project Detail: The project will come up along with a modernization cum expansion of its API manufacturing project. The estimated cost of the total project is Rs. 600 million.

Current Status: The project is waiting for environmental clearance. The project is planned for completion in 2 years from zero date.


Maharashtra State Power Generation Company plans renovation and modernization of 210 MW Nashik Thermal Power Station Unit-3

February 19, 2011

Thermal Power

Status: Planning
Promoter: Maharashtra State Power Generation Company Limited
Project Name: Maharashtra State Power Generation Company Project Of Nashik Thermal Power Station Unit-3
Capacity: 210 MW
Location: Nashik
Current Status: As of February 2011, work on the project is under planning stage. EoI’s were invited for Providing Consultancy Services for Implementation of Indo-German Energy Efficiency & Life Extension Programme for Renovation and Modernization Project of Nashik Thermal Power Station Unit-3 (210MW), last date of submission: 31-March-2011.


Konaseema Gas Power plans for expansion of gas based combined cycle power plant from 445 MW to 1265 MW in Andhra Pradesh. All necessary approvals are received for the project.

January 29, 2011

Thermal Power

Status: Planning
Promoter: Konaseema Gas Power Limited
Project Name: Expansion Gas based Combined Cycle Power Plant
Capacity: from 445 MW to1265 MW
Location: Ravulapalam, near Rajahmundry in dist. East Godavari, Andhra Pradesh.
Current Status: As of January 2011, work on the project is under planning stage. All necessary approvals are received for the project.


Maruti Clean Coal & Power plans to set up 300 MW thermal power plant in Chhattisgarh. Land is acquired for the project. Project obtained environment clearance and consent to establishment.

January 22, 2011

Thermal Power

Status: Planning
Promoter: Maruti Clean Coal & Power Limited
Project Name: Coal Power Plant
Capacity: 1X300 MW
Location: Village Bandakhar, Tehsil Pali, Korba District, Chhattisgarh
Current Status: As of January 2011, work on the project is under planning stage, land is acquired for the project. Project obtained environment clearance and consent to establishment. Bids were invited for Design, engineering, manufacturing, procurement, supply, transportation to site, handling, storage, construction, erection, installation, testing, completion, commissioning on EPC basis, last date of submission: 2-March -2011.


Noida Power plans to set up 400 MW ± 10% Gas Based Combined Cycle Power Plant in Uttar Pradesh. Bids were invited from contractors for the project on turnkey basis.

December 24, 2010

Thermal Power

Status: Planning
Promoter: Noida Power Company Limited
Project Name: Gas Based Combined Cycle Power Plant
Capacity: 400 MW ± 10%
Location: Greater Noida, dist. Gautam Buddha Nagar, Uttar Pradesh.
Current Status: As of December 2010, work on the project is under planning stage. Bids were invited for 400 MW ± 10% Gas Based Combined Cycle Power Plant from contractors for the project on turnkey basis.