Government Of India is planning widening & strengthening of highway section in dist. Nashik, Maharashtra.

March 1, 2016

Roads & Highways

 

Status: Planning Stage

Promoter: Government Of India, Ministry Of Road Transport & Highways

Project:  Plans widening & strengthening of existing highway section

Location:  Dist. Nashik, Maharashtra

Project Details:  PBA Infrastructure, in Joint Venture has secured the contract worth Rs. 1.5775 billion for widening & strengthening of existing highway section to 2-lane with paved shoulder of NH No. 848 which includes section from km 16/000 to km 34/000, km 39/000 to 57/000 & km 62/000 to 65/600 (approximately 39.600 km) Design chainage 16.025 to 33.943, 38.945 to 56.533 & 61.515 to 65.115 (approx. 39.106 km) in dist. Nashik on Engineering, Procurement & Construction (EPC) contract – letter of award.


Coimbatore Medical College Hospital has completed construction of the centenary building in Coimbatore, Tamil Nadu.

February 16, 2016

Hospitals

Status: Completed

Promoter: Coimbatore Medical College Hospital

Project: Completed construction of the centenary building

Location: CMC hospital campus, Gopalapuram, dist. Coimbatore, Tamil Nadu

Project Details: The building with 700 beds occupies 323,000 sq. ft of land. The estimated cost of the project is Rs. 610 million. The project work has been completed. The project is expected to be commissioned by the end of February 2016. According to media reports, the centenary building has 13 state-of-the-art operation theatres. It will take number of operation tables in CMCH to 44 including 31 tables in the existing buildings and facilitate performing more than 100 surgeries a day. On completion, the new building will have departments such as cardiology, cardio thoracic, neurosurgery, neurology, plastic surgery, medical and surgical gastroenterology, nephrology and urology. Casualty, toxicology, intensive coronary care unit and intensive medical care unit will also be shifted to the new building. The centenary building will also have trauma and orthopaedic wards in addition to the existing trauma and orthopaedic wards.


Escapade Resorts is planning to construct a beach resort in Kanyakumari, Tamil Nadu.

February 16, 2016

Resorts

Status: Planning Stage

Promoter: Escapade Resorts

Project: Plans to construct a beach resort

Location: Village Thengamputhoor, dist. Kanyakumari, Tamil Nadu.

Project Details: The estimated cost of the project is Rs. 47.4 million. The project is waiting for CRZ clearance. According to MoEF sources, total plot area is 53,290 sq. mtrs and built-up area is 5,168 sq. mtrs. The project will entail construction of 28 resort cottages with swimming pool, spa, health club, internal roads, parking & services etc. Total power required during construction and operation phase will be 30 KW and 75 MW. 30 KLD sewage treatment plant is to be developed within the project premises.


The Ramco Cements proposes capacity up gradation of Line-1 cement plant & captive power plant in Andhra Pradesh.

January 8, 2016

Cement & concrete products

Project Status: Planning

Promoter: The Ramco Cements

Project: Capacity up gradation of Line-1 cement plant and setting up a new captive power plant

Location: Village Jayanthipuram, dist. Krishna, Andhra Pradesh

Project Details: The current status of the project could not be ascertained. According to BSE reports, Petron Engineering Construction has received Letter of Intent from the company for civil and mechanical works for the project. The contract value is Rs. 225 million.


Gangamai Industries & Constructions is implementing an expansion of its molasses-based distillery in dist. Ahmednagar, Maharashtra.

November 7, 2015

Distillery

Status: Under Implementation

Promoter: Gangamai Industries & Constructions

Project: Capacity expansion of molasses-based distillery

Location: Village Najik Babhulgaon, dist. Ahmednagar, Maharashtra

Project Cost: The estimated cost of the project is Rs. 165 million.

Project Details: The capacity is augmented from 30 KLD to 60 KLD. Civil work has been completed. Machinery erection is in progress. The project is scheduled for completion in November 2015.


Indian Oil Corporation is planning a new ATF facility and KSP in Arunachal Pradesh.

September 3, 2015

Petroleum Refining

Status: Planning Stage

Promoter: Indian Oil Corporation

Project: Plans a new ATF facility and KSP

Location: Arunachal Pradesh

Project Details: E-tenders have been invited for the construction of new ATF facility at 1. Daporijo, dist. Upper Subansiri and KSP at 2. Bararupak-I, dist. Upper Subansiri 3. Bararupak-II, dist. Subansiri 4. Moying, dist. Upper Siang 5. Tuting, dist. Upper Siang in Arunachal Pradesh. The estimated cost of the project is Rs. 19.09 million. The last date for submission of bids was 29th July, 2015. The period of completion is 22 weeks.


Airports Authority Of India is planning an extension of runway in dist. Dibrugarh, Assam.

May 21, 2015

Airports

Status: Planning Stage

Promoter: Airports Authority Of India

Project: Plans an extension of runway

Location: Dibrugarh Airport, dist. Dibrugarh, Assam

Project Details: The project will envisage extension of runway from 05/23 of 1836 m x 60 to 2407 m x 300 dimension, construction of isolation bay, link taxiway and other allied works. The estimated cost of the project is Rs. 598.5 million. Tenders had been recently invited for the extension work.The project is awaiting environmental clearance.

According to MoEF sources, the total area of the existing airport is 253.959 acres. Indian Army and IAF have recently accorded working permission to AAI for 5.33 acres and 0.71 acres of their respective land. In addition, 32.5 acres land has been handed over to Airports Authority of India for proposed extension. The existing terminal building covers 10536 sqm plinth area. The scope of the extension work includes civil works, electrical works, CNS works.

Civil works include: Extension of runway 05/23 towards runway 05 beginning, provision of runway shoulders, turn pad, grading of runway strip, construction of boundary wall, storm water drain for extended portion of runway beyond the runway strip of 300m, provision of perimeter road, rerouting and construction of 5m wide link road to Nepalipatti, drainage system, box culverts etc.