Geoenpro Petroleum proposes drilling of development wells and exploratory/appraisal wells in dist. Changlang, Arunachal Pradesh.


Oil & Gas Exploration & Extraction

Status: Planning Stage

Promoter: Geoenpro Petroleum proposes

Project: Plans drilling of 40 development wells and 5 exploratory/appraisal wells

Location: In Kharsang Oil Field (KOF), dist. Changlang, Arunachal Pradesh

Cost: The estimated cost of the project is Rs. 7200 million

Project Detail: According to MoEF sources, total mining lease area is 11 Sq. Kms. Present production rate of oil and gas is around 1500 BOPD and 50,000 Cu. mtrs/ day respectively. 94.712 hectares of forest land is involved. Water (50 cu. mtrs/ day) from the nearby river will be drawn during drilling activities. Waste generated from the KOF is mainly in the form of formation water and minor sludge. An effluent treatment plant (ETP) with treating capacity of 200 KLD is already operational in KOF. Power requirement will be met from the existing power house. KOF is equipped with 3 gas fired gensets (1×450 KVA and 2×180 KVA) and one diesel genset (1×170 KVA) to meet the power requirement. Forest clearance is to be obtained for 94.712 hectares forest land. Public hearing has been conducted.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: