Raptakos Brett & Company is planning to construct a children hospital building in dist. Thane, Maharashtra.


Hospitals

Status: Planning Stage

Promoter: Raptakos Brett & Company

Project: Plans to construct a 105 beds children hospital building

Location: Majiwade, dist. Thane, Maharashtra

Project Details: The project will spread over 7,608.95 sq.ft. The project is waiting for environmental clearance. Other details are yet to be finalized. According to MoEF sources, the project comprises of 1 hospital building (B+G+6 floors). FSI area is 12,585.70 sq.mtrs. and total construction area is 24,150.41 sq.mtrs. Maximum height of the building is 29.70 m. Wastewater generated (95 KLD) used will be treated in STP of 95 KLD capacity. Biomedical waste generation will be 788 kg/month which will be handed over to MPCB authorized agency for safe disposal.

The total power requirement during construction phase is 200kVA and will be met from Maharashtra State Electricity Distribution Company Limited (MSEDCL) and total power requirement during operation phase is 5.35MW and will be met from MSEDCL. Rooftop rainwater of buildings will be collected in one RWH tank of total 44 cu.mtrs capacity for harvesting after filtration. Parking facility for 86 four wheelers and 130 nos. of two wheelers is proposed to be provided against the requirement of 84 four wheelers and 126 two wheelers.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: