Gujarat State Road Development Corporation is implementing 6-laning of the Bagodara-Vasad road of SH-8 in Gujarat.


Roads & Highways

Status: Under Implementation
Promoter: Gujarat State Road Development Corporation
Project: 6-laning of the Bagodara-Vasad road (Km 0/0 to Km 101/9) Of SH-8 on BOT basis
Cost: Rs. 8, 839 million
Location: Gujarat.
Contractor: GVK Bagodara Vasad Expressway, a subsidiary of GVK Power & Infrastructure
Current Status: As of April 2013,civil work is in progress. The project is scheduled for completion in Q1 2014. The project has a concession period of 27 years including construction period of 3 years.The length is 101.76 Kms. The width of the carriageway is 6 lane divided dual carriageway with median. Paved shoulders on both sides having equivalent crust same as the main carriageway is 1.5 Mtrs. Hard side shoulder on both sides is 1.0 Mtr. The project highway is a part of SH-8, which provides key connectivity to two national highways, viz., NH-8A (Ahmedabad-Rajkot-Probandar), and NH-8 (Mumbai-Delhi). The project highway caters to commercial traffic from industrial clusters in Bhavnagar, Savli, Sanand, Anand and ports in Saurashtra region (Pipavav, Porbandar, Mundra and Kandla). The shortest link connecting Saurashtra/Kutch region to the highly industrialized regions of Surat, Vadodara, Ankleshwar and Mumbai.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: